You don't have javascript enabled. Good luck with that.
Pencarian
 Transjakarta Tambah Layanan Malam Hari di Empat Koridor

Transjakarta Operates Night Shift Today

PT Transjakarta added four night bus (locally known as Amari) corridors. Therefore, there are seven corridors of Transjakarta that operate night shift buses, they are corridor II (Harmoni – Pulo Gadung), corridor V (PGC –Ancol), corridor VIII (Harmoni – Lebak Bulus) and corridor X (PGC – Tanjung Priok).

From now on until onward, those corridors will serve local people in the early

The director of PT Transjakarta, Antonius Kosasih expressed, previously there were only three corridors that operated night buses, such as Corridor I (Blok M – Kota), Corridor III (Harmoni – Kalideres) , Corridor IX (Pinang Ranti – Pluit). “From now on until onward, those corridors will serve local people in the early,” he said via press release, Wednesday (5/6).

Some Bus Operators Agreed to Join with PT Transjakarta

As a start there would be 28 buses will be operated in such corridors. The night-bus service will daily operate from 22.10 PM to 04.30 AM, with regular normal ticket price Rp 3,500 per person.

The following are the list of night buses shelters :

Corridor I,  Pulogadung 1, Pulomas, Cempaka Timur, RS Islam, Rawa Selatan, Senen, Kwitang, Monas, Gambir 1, and Harmoni. 

Corridor V, PGC 2, BKN, UKI Cawang, BNN, Kampung Melayu, Pasar Jatinegara, Slamet Riyadi, Matraman 2, Salemba UI, Kramat Sentiong, Central Senen, Pasar Baru Timur, Jembatan Merah, Mangga Dua Square, Pademangan, and Ancol.  

Coridor VIII, Harmoni, Tomang, Grogol 2, Kedoya Green Garden, Duri Kepa, Kebon Jeruk, RS Medika, Simprug, Pasar Kebayoran Lama, Pondok Indah 2, Pondok Indah 1 and Lebak Bulus. 

Corridor X, PGC 2, Cawang UKI, Cawang Sutoyo, Penas Kalimalang, Utan Kayu Rawamangun, Kayu Putih Rawasari, Pulomas Bypass, Cempaka Mas 2, Yos Sudarso Kodamar, Sunter Kelapa Gading, Plumpang Pertamina, Permai Koja, Enggano, and Tanjung Priok.

Kosasih added, the night bus operational headway will be arranged, because it operate at night with sterile track. “The headway will be adjusted, 10-30 minutes. In the next future whole corridors must be operate 24 hours,” he disclosed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing